Building Update 3.0 / Exterior Transformation
/Exterior Transformation
December 2017, Derry and the D&S team were looking at this old yellow building and dreaming of future plans. 11 months later, the plans and dreams have come to reality before our eyes.
To name a few of the major renovations, we installed a new standing seam metal roof, asphalt driveway, and garage door. We had the exterior painted and put up Dryvit on the face of the showroom. We took the power lines down and ran them to the building underground. There’s new lighting and even road signage. We think it looks pretty great!
Thanks to all who had a hand in this great undertaking!